Air conditioning units for "Yeoman Bontrup"
In the scope of the air-conditioning installation, two condensing units were produced and delivered for air-handling units with a capacity of 228kW each, including oil separators, refrigerant tanks, as well as refrigeration and control system and connection for monitoring and alarm system on the ship.
Cold stores on "Yeoman Bontrup"
In the scope of cold stores equipment, there was a supply of condensing unit for evaporation of -26oC, fan coolers in the chambers and cooling coil in the room with the required reduced level of sound level.
In addition, provisioning chambers with refrigerated doors and stainless steel shelves were delivered and installed.
Service work on "Yeoman Bridge"
As part of the service order for air handling units of a superstructure, steam heaters were replaced in each air handling unit.